Facility basics
Prepare the site location, floor dimensions, ceiling height, operating hours and a description of the heat problem.
Cooling target
State whether the priority is a full-area cooling effect, a specific hot zone, a ducted system or a side outlet arrangement.
Decision-ready enquiry
Include required quantity if known, desired delivery timing and photos or drawings. This helps a supplier respond with a focused configuration discussion.
